ELASTIC RECOVERY MOULDS FOR MODIFIED BITUMEN.

image

ELASTIC RECOVERY MOULDS FOR MODIFIED BITUMEN.

As Per IRC-SP53:2000.

The elastic recovery of modified bitumen is evaluated by comparing recovery of thread after conditioning specimen for 1 hour at specified temperature and specimen us elongated up 10 cm deformation in a ductility machine.

image
ELASTIC RECOVERY MOULDS FOR MODIFIED BITUMEN.
  • Order Code: AIC-ERM-MB36.
  • Add To Enquiry Box